Series 37H
Chem-Prime H.S.
Generic Type
Phenolic Alkyd
Common Usage
Lead- and chromate-free, fast-drying, corrosion-resistant primer that accepts a variety of high-performance topcoats. Ideally suited for steel fabricators, OEM’s and field applications. Note: Not recommended for immersion.
View more product detailsProduct Data Sheets
- English_Series_37H_Chem_Prime_Hs_pds.pdf
- French_Series_37H_Chem_Prime_Hs_pds.pdf
- Spanish_Series_37H_Chem_Prime_Hs_pds.pdf
Safety Data Sheets
Email this productContact your sales reps for quotes, problem solving advice, extensive technical knowledge, pricing, ordering and field support.
Colors
- 37H-078 Gray
- 37H-077 Red
View Available Colors
View available colors in our Color Tool; you can also select and request color swatches.
Topcoats
Series 2H, 2HS, 27, 37H, 43-36, 66, L69, L69F, N69, N69F, V69, V69F, 73, 113, 114, 115, V115, 161, 180, 181, 1026, 1028, 1029, 1074, 1074U, 1075, 1075U, 1094, 1095, 1096.
Note: Allow Series 1026 to cure one week before topcoating. Note: Some systems are not recommended for frequently sweating or continually wet conditions. Reference the applicable topcoat data sheet for additional information. Also, an additional coat of 37H is suggested before applying Series 180 or 181. Contact Tnemec Technical Services for details.
Volume Solids
56.0 ± 2.0% †
HAPS
Unthinned: 2.20 lbs/gal solids
Thinned 4% (No. 2 Thinner): 2.72 lbs/gal solids
Thinned 9% (No. 2 Thinner): 3.36 lbs/gal solids
Curing Time
Temperature: 75°F (24°C)
To Handle: 30 minutes
To Recoat With Series:
| Series 2H, 2HS, 37H, 43-36 || Series 113, 114, 115, V115, 180, 181, 1026, 1028, 1029 || Series 27•, 66•, L69, L69F, N69, N69F, V69, V69F, 73, 161•,1074, 1074U, 1075, 1075U, 1094, 1095, 1096 |
| 16 hours || 24 hours || 24 hours |
---Curing time varies with surface temperature, air movement, humidity and film thickness.
•Note: Allow 37H to cure 14 days if 27, 66 or 161 is to be used as an intermediate coat and topcoated with 73, 1074, 1074U, 1075 or 1075U. Then allow 27, 66 or 161 to cure an additional 24 hours before topcoating.
Water Tank Exteriors: Five days or more curing required before filling.
Number of Components
One
Volatile Organic Compounds
Unthinned: 2.75 lbs/gallon (330 grams/litre)
Thinned 4% (No. 2 Thinner): 2.94 lbs/gallon (352 grams/litre)
Thinned 9% (No. 2 Thinner): 3.15 lbs/gallon (377 grams/litre)
Theoretical Coverage
898 mil sq ft/gal (22.0 m²/L at 25 microns). See APPLICATION for coverage rates. †
Recommended DFT
2.0 to 3.5 mils (50 to 90 microns) per coat.
Still have questions? Request the information you’re looking for:
Request InfoHow to Purchase
Tnemec coatings are sold through a select network of local independent sales representatives who can help you find the best product for your needs. Find a rep