Tampa Bay SWTP

Tampa Bay Water (the Utility) developed a $610 million Master Water Plan blueprint to meet the long-term drinking water needs for more than two million customers in the Tampa Bay region. In 1998 the first configuration of projects was approved, including a phase one strategy to deliver a surface water treatment plant (SWTP).

In March 2000, the Utility entered into a $144 million, 15-year design/build/operation (DBO) agreement with USFilter Operating Services to carry out the design and construction of the new state-of-the-art SWTP and to provide for its day-to-day operation. The plant is among the most technologically sophisticated in the world and is also the nation’s largest DBO water project.

USFilter partnered with CDM to produce complete design drawings. During construction, CDM turned to Tnemec for solutions to the challenges of protecting diverse plant operation surfaces and substrates spread over 20 acres, including carbon steel, concrete (both pre-cast and poured-in-place), concrete masonry units (CMU), ductile iron and alloy steel.

Tnemec consultants specified four categories of coatings systems needed to protect the wide variety of substrates throughout the treatment plant, including protective linings, exterior masonry and steel coatings, corrosion resistant coatings and floor coatings and overlayment systems. Protective linings were specified for the interior of the settling, maturation, coagulation and injection tanks, and on submerged concrete in the gravity thickener tank, recycle surge basin and influent box.

Exterior masonry and steel coatings were specified for all piping and pumps, exterior concrete, CMU, containment areas and in the maintenance and storage buildings.

Corrosion resistant coatings were specified for all interior and exterior pipe galleries, filters, submerged steel, walls and ceilings of the operations building.

Floor coatings and overlayments were applied to the maintenance area, chemical storage area, gravity thickener room, control rooms and bathrooms.

All piping and valves throughout the plant were also coated with a tough polyurethane for UV protection. “Because of the plant’s enhanced coagulation treatment process, it was extremely important to have the right coatings to protect the extensive concrete and steel substrates against this low pH water environment, which is aggressive and borderline corrosive,” USFilter Plant Manager David Hackworth said.

    Project Information

    Location
    Tampa, FL

    Completion
    Fall 2002

    Owner
    Tampa Bay Water

    Engineer
    CDM, Tampa, FL

    Applicator
    Universial Painting, Lakeland, FL

    DBO
    US Filter Operating Services, Houston, TX

    Printer Friendly Version

    PP_Tampa_Bay_SWTP_Profile

    Contact Your Rep

    Looking for Some Local Coatings Guidance?

    Reach out to one of our knowledgable and reliable representatives near you.

    Sustainable Building

    Need Coatings for LEED Projects?

    Tnemec offers a long list of low VOC coatings built to protect sustainable structures.

    How to Purchase

    Ready to Order Tnemec?

    We're ready to help. Click below to learn more about our purchasing process.

    Continue Exploring in the color tool

    Close

    Color Swatch packet

    When you finish selecting, request your Swatch Packet below. Expect your swatch cards in 5-7 business days. Contact your expert Sales Rep at any time.

    Sorry, there is a maximum of 6 color swatches.

    Request swatch packet

    Continue Exploring in the color tool

    Close