Cross Station Unit #3 & #4 Coal-Fired Power Plants

Long before Santee Cooper started construction on a pair of new 600-megawatt coal-fired power plants at the Cross Station in South Carolina, a protective coating system from Tnemec had generated confidence among project engineers. “The new plants joined an existing coal-fired facility where the same coating system had been used,” according to Tnemec coating consultant Dan Anderson. “The deciding factor was the success Santee Cooper has had with Tnemec products over the past 15 years. Rather than choosing coatings based solely on initial price, Santee Cooper investigated the life cycle cost of the paint based on company experience.”

Prior to selecting the Tnemec coating system, Santee Cooper subjected other manufacturers’ products to head-to-head testing against Tnemec in a third-party laboratory. “Tnemec coatings outperformed all challengers,” Anderson reported.

After surface preparation in accordance with SSPC-SP6/NACE No. 3 Commercial Blast Cleaning, all interior and exterior steel at Cross Station Units 3 and 4 was shop-primed with Series 90-97 Tneme-Zinc, a moisture-cured, zinc-rich aromatic urethane. After the steel was erected and spot-primed, a full coat of Series 113 H.B. Tneme-Tufcoat, a waterborne acrylic epoxy, was applied for resistance to staining, abrasion, chemicals and moisture. A finish coat of Series 30 Spra-Saf EN, an advanced technology acrylic, was then spray-applied to complete the system.

Unit 3 includes state-of-the-art environmental control technology, including a selective catalytic reduction (SCR), wet-flue-gas desulfurization system (or scrubber) and continuous emissions monitoring equipment to help reduce emissions of nitrogen oxide and sulfur dioxide. The SCR was shop-primed with Tneme-Zinc primer followed by a shop-applied finish coat of Series 73 Endura-Shield, an aliphatic acrylic polyurethane. Endura-Shield is highly resistant to abrasion, wet conditions, corrosive fumes, chemical contact and exterior weathering.

Unit 3 was constructed in 30 months, which was an aggressive schedule for a project of this magnitude. “Because the Tnemec system dries so fast, applicators were able to get more done in a day,” Anderson added. “Plus they were able to work around the weather.”

Construction work continues on Cross Unit 4, which is on track to become operational in January 2009. When completed, it will bring the total output generated at Cross Station to 2,425 megawatts, making it the largest coal-fired generating unit in both North and South Carolina. Santee Cooper is South Carolina’s stateowned electric and water utility and services more than 155,000 residential and commercial customers.

    Project Information

    Completion
    March 2006

    Applicator
    Avalotis Pittsburgh, Pennsylvania

    Location
    Cross, South Carolina

    Owner
    Santee Cooper Moncks Corner, South Carolina

    Engineer
    Santee Cooper Moncks Corner, South Carolina

    Printer Friendly Version

    PP_Cross_Station_Unit_Profile

    Contact Your Rep

    Looking for Some Local Coatings Guidance?

    Reach out to one of our knowledgable and reliable representatives near you.

    How to Purchase

    Ready to Order Tnemec?

    We're ready to help. Click below to learn more about our purchasing process.

    Sustainable Building

    Need Coatings for LEED Projects?

    Tnemec offers a long list of low VOC coatings built to protect sustainable structures.

    Continue Exploring in the color tool

    Close

    Color Swatch packet

    When you finish selecting, request your Swatch Packet below. Expect your swatch cards in 5-7 business days. Contact your expert Sales Rep at any time.

    Sorry, there is a maximum of 6 color swatches.

    Request swatch packet

    Continue Exploring in the color tool

    Close