Series 61

Tneme-Liner

Generic Type

Cycloaliphatic Amine Epoxy

Common Usage

Tightly cross-linked epoxy with excellent corrosion and chemical resistance. Principally used for immersion services, including fuel and crude oil storage, fuel pipelines, pressure vessels, chemical containment and wastewater treatment.

Special Qualifications

A two-coat system of Series 61 at 4.0 to 6.0 dry mils (100-150 dry microns) per coat passes the performance requirements of MIL-PRF-4556F. Series 61 conforms to API 652 for lining above ground storage tanks.

View more product details

Volume Solids

82.0 ± 2.0% (mixed) †

Number of Components

Two: Part A (amine) and Part B (epoxy)

HAPS

Unthinned: 1.53 lbs/gal solids
Thinned 10%: 2.42 lbs/gal solids

Finish

Semi-gloss

Topcoats

Note: Series 61 can be topcoated with select Tank Armor linings depending on service conditions. Contact Tnemec Technical Service for recommendations.

Note: To minimize pinhole formation in the topcoat, it is recommended that the concrete substrate be fully resurfaced, and/or primed prior to topcoat application.

Primers

Steel: Self-priming
Concrete: Self-priming or Series 215, 217, N218
CMU: Series 215, N218

Volatile Organic Compounds

EPA Method 24
Unthinned: 0.36 lbs/gallon (45 grams/litre)
Thinned 6%: 0.71 lbs/gallon (85 grams/litre)
Thinned 10%: 1.21 lbs/gallon (145 grams/litre) †

Recommended DFT

  1. For JP-4, JP-5, JP-8, Aviation Gas and Jet A-1: 4.0 to 6.0 mils (100 to 150 microns) per coat (minimum of two coats).
  2. Most Other Applications: 8.0 to 12.0 mils (205 to 305 microns) per coat (minimum of two coats). Contact your Tnemec representative for specific recommendations.

Curing Time

Temperature To Handle To Recoat Immersion
75°F (24°C) at 4.0 mils 100 microns) 6 hours 16-18 hours• 5 to 7 days
75°F (24°C) at 12.0 mils 305 microns) 11 hours 16-18 hours• 5 to 7 days

Curing time varies with surface temperature, air movement, humidity, and film thickness.
• Maximum recoat time with itself is 7 days. Extended maximum recoat time of 14 days is allowed when used as a primer for Tank Armor products. If recoat time is exceeded, the coated surface must be scarified before topcoating.

Theoretical Coverage

1,315 mil sq ft/gal (32.3 m²/L at 25 microns). See APPLICATION for coverage rates. †

Still have questions? Request the information you’re looking for:

Request Info

How to Purchase

Tnemec coatings are sold through a select network of local independent sales representatives who can help you find the best product for your needs. Find a rep

Continue Exploring in the color tool

Close

Color Swatch packet

You can use our Color Tool page to explore our available colors and request swatches of colors you like.

Sorry, there is a maximum of 6 color swatches.

Request swatch packet

Continue Exploring in the color tool

Close